• Mon 92°F / 59°F

Rigby High School Construction Problems


(RIGBY) – Two big areas of discolored brick were discovered during the construction of the new Rigby High School. One patch was discovered on the east side of the auxiliary gym and the other was located on the shorter south wall of the main gym. The walls became darker when construction crews power-washed the brick on a higher setting. Local News 8 reports that the project contractor and mason are working together to come up with a solution, but the subzero weather makes construction outside difficult.

Advertise With Us

Would you like to advertise on East Idaho News? Fill out this form to contact a representative.
  • Full and Last
  • The name of your company, business or brand.