Rigby High School Construction Problems
Published at(RIGBY) – Two big areas of discolored brick were discovered during the construction of the new Rigby High School. One patch was discovered on the east side of the auxiliary gym and the other was located on the shorter south wall of the main gym. The walls became darker when construction crews power-washed the brick on a higher setting. Local News 8 reports that the project contractor and mason are working together to come up with a solution, but the subzero weather makes construction outside difficult.