Construction begins Monday on US-20/26 from Butte to Arco - East Idaho News
Local

Construction begins Monday on US-20/26 from Butte to Arco

  Published at

The following is a news release from the Idaho Transportation Department.

ARCO — The Idaho Transportation Department maintenance crews will begin construction on US-20/26 from Butte City to Arco on Monday, Aug. 24.

Crews will be paving an asphalt overlay from milepost 249 through 256. This pavement preservation project will provide a smoother, safer ride for motorists by eliminating cracks and ruts on the road’s surface along with extending the lifespan of the highway.

Motorists should anticipate reduced speeds and lanes reduced to a single-lane. Traffic control will be in place with a pilot car to guide traffic through the work zone. Drivers are encouraged to watch for flaggers in the work zone. Motorists are encouraged to plan their commute accordingly.

The project is expected to be completed by Thursday, Aug. 27. Motorists are encouraged to drive safely and attentively through work zones.

Check 511.idaho.gov for current road construction and conditions.

SUBMIT A CORRECTION